Enterprise Wide Optimization
People | Projects
|
Crane Scheduling for ABB: Progress Report A progress report on the problem of scheduling two cranes to transfer material between locations in a copper processing facility. The objective is to minimize deviation from desired start times or completion times. John Hooker | March 2006 |
|
Air Products: Rescheduling Bulk Gas Production & Distribution How should production levels be set and sourcing decisions be made in order to meet customer demand at minimum cost? Jeff Linderoth | March 2006 |
|
BP: Case Study Progress Report The goal is to extend BP's current medium-term operations planning model so that it will account for the uncertainty in the forecasts of the future economic environment. Andrew Schaefer | March 2006 |
|
Dow: Integrated Production Planning & Scheduling for Batch Operations The goal is to propose a novel decomposition algorithm to integrate planning and scheduling for Multisite Batch Reactors and ensure optimality and consistency between the two levels. Ignacio Grossmann | March 2006 |
|
ExxonMobil: Scheduling of Crude Oil Movements at Refinery Front-End The objective is to minimize the cost of scheduling and planning the flow of crude oil in petrochemical refineries with an optimum schedule for the movement of crude oil. Ignacio Grossmann | March 2006 |
Enterprise Wide Optimization Website
If you would like to be involved, contact Faculty Director — Ignacio Grossmann or fill out our Feedback Form and an ICES staff member will respond to you.